您当前的位置: 首页 >> 公示公告 >> 其它 >> 甘肃省国土资源厅关于竞争性谈判确定2018年省地勘基金项目(新立)承担单位的公告

甘肃省国土资源厅关于竞争性谈判确定
2018年省地勘基金项目(新立)承担单位的公告

时间:2018-07-05 | 来源:甘肃省国土资源厅 | 点击数:2995

根据《甘肃省地质勘查基金管理办法》(甘政办发〔2009〕1号),经2018年7月3日第13次厅务会议研究,决定对甘肃省张掖盆地中东段地热资源普查等21个拟设省地勘基金项目,通过竞争性谈判方式确定项目承担单位。现将有关事项公告如下:

一、项目概况


序号

项目名称

拐点坐标

经费

(万元)

备注



(80坐标)

(2000坐标)



1

甘肃省张掖盆地中东段地热资源普查

1,100.2539,38.5816

2,100.2550,38.5824

3,100.2553,38.5816

4,100.2552,38.5810

5,100.2549,38.5804

1,100.2543,38.5817
2,100.2554,38.5825
3,100.2557,38.5817
4,100.2556,38.5811
5,100.2553,38.5805

650


2

甘肃省阿克塞县当金山石灰岩矿详查

1,94.2051,39.1940
2,94.2051,39.1907
3,94.2120,39.1913
4,94.1950,39.1803
5,94.1918,39.1836

1,94.2055,39.1941
2,94.2055,39.1908
3,94.2124,39.1914
4,94.1954,39.1804
5,94.1922,39.1837

300


3

甘肃省阿克塞县雁丹图水泥用粘土矿详查

1,94.3643,39.2855
2,94.3733,39.2855
3,94.3733,39.2836
4,94.3643,39.2836

1,94.3647,39.2856
2,94.3737,39.2856
3,94.3737,39.2837
4,94.3647,39.2837

70


4

甘肃省阿克塞县雁丹图石膏矿详查

1,94.3650,39.2340
2,94.3810,39.2340
3,94.3810,39.2300
4,94.3650,39.2300

1,94.3654,39.2341
2,94.3814,39.2341
3,94.3814,39.2301
4,94.3654,39.2301

260


5

甘肃省肃北县大敖包沟晶质石墨矿普查

1,95.4200,39.4803
2,95.4425,39.4803
3,95.4425,39.4630
4,95.4200,39.4630

1,95.4204,39.4804
2,95.4429,39.4804
3,95.4429,39.4631
4,95.4204,39.4631

400


6

甘肃省金昌市绿草泉沟磷矿普查

1,101.5452,38.3556
2,101.5557,38.3556
3,101.5557,38.3549
4,101.5648,38.3549
5,101.5648,38.3542
6,101.5703,38.3542
7,101.5703,38.3425
8,101.5452,38.3425

1,101.5455,38.3556
2,101.5601,38.3556
3,101.5601,38.3549
4,101.5652,38.3549
5,101.5652,38.3542
6,101.5707,38.3542
7,101.5707,38.3425
8,101.5455,38.3425

300


7

甘肃省瓜州县浪柴沟晶质石墨矿普查

1,95.4456,40.0900
2,95.4956,40.0900
3,95.4956,40.0707
4,95.4701,40.0707
5,95.4456,40.0615

1,95.4500,40.0901
2,95.5000,40.0901
3,95.5000,40.0708
4,95.4705,40.0708
5,95.4500,40.0616

300

入库项目

8

甘肃省玉门市前红泉萤石矿普查

1,97.4240,40.3430
2,97.4500,40.3430
3,97.4500,40.3255
4,97.4240,40.3255

1,97.4244,40.3430
2,97.4504,40.3430
3,97.4504,40.3255
4,97.4244,40.3255

250


9

甘肃省白银市老和尚湾及外围金多金属矿普查

1,104.1949,36.3104
2,104.2550,36.3104
3,104.2549,36.3309
4,104.1947,36.3307

1,104.1953,36.3104
2,104.2554,36.3104
3,104.2553,36.3309
4,104.1951,36.3307

300


10

甘肃省白银市青牛沟及外围金多金属矿普查

1,104.1655,36.3433
2,104.1748,36.3448
3,104.1702,36.3641
4,104.1610,36.3625

1,104.1659,36.3433
2,104.1752,36.3448
3,104.1706,36.3641
4,104.1614,36.3625

260


11

甘肃省肃北县虎跃山铅锌银多金属矿普查

1,97.0351,42.0955
2,97.0736,42.0955
3,97.0736,42.0828
4,97.0351,42.0900

1,97.0356,42.0955
2,97.0740,42.0955
3,97.0740,42.0829
4,97.0356,42.0900

300


12

甘肃省肃北县鱼脊山蓝晶石矿普查

1,97.2820,40.4323
2,97.2820,40.4258
3,97.2832,40.4257
4,97.2846,40.4237
5,97.2957,40.4234
6,97.2955,40.4241
7,97.3029,40.4242
8,97.3108,40.4256
9,97.3108,40.4306
10,97.3233,40.4307
11,97.3232,40.4327

1,97.2824,40.4324
2,97.2824,40.4259
3,97.2836,40.4258
4,97.2850,40.4238
5,97.3001,40.4235
6,97.2959,40.4242
7,97.3033,40.4243
8,97.3112,40.4257
9,97.3112,40.4307
10,97.3237,40.4308
11,97.3236,40.4328

300


13

甘肃省肃北县红石山金及多金属矿普查

1,96.3249,42.2811
2,96.3250,42.2603
3,96.3339,42.2603
4,96.3340,42.2531
5,96.3554,42.2530
6,96.3551,42.2633
7,96.3755,42.2636
8,96.3753,42.2711

1,96.3254,42.2812
2,96.3255,42.2604
3,96.3344,42.2604
4,96.3345,42.2532
5,96.3559,42.2531
6,96.3556,42.2634
7,96.3760,42.2637
8,96.3758,42.2712

280


14

甘肃省张掖市甘州区芦草台子勘查区煤炭详查

1,100.3531,39.2028
2,100.3531,39.2005
3,100.3702,39.2005
4,100.3702,39.1830
5,100.3531,39.1830
6,100.3531,39.1607
7,100.4607,39.1616
8,100.4607,39.1628
9,100.4537,39.1628
10,100.4537,39.1643
11,100.4507,39.1643
12,100.4507,39.1658
13,100.4437,39.1658
14,100.4437,39.1713
15,100.4352,39.1713
16,100.4352,39.1743
17,100.4322,39.1743
18,100.4322,39.1758
19,100.4307,39.1758
20,100.4307,39.1813
21,100.4237,39.1813
22,100.4237,39.1828
23,100.4222,39.1828
24,100.4222,39.1843
25,100.4207,39.1843
26,100.4207,39.1928
27,100.4137,39.1928
28,100.4137,39.1943
29,100.4107,39.1943
30,100.4107,39.1958
31,100.4007,39.1958
32,100.4007,39.2013
33,100.3822,39.2013
34,100.3822,39.2028

1,100.3536,39.2029,
2,100.3536,39.2006,
3,100.3707,39.2006,
4,100.3707,39.1831,
5,100.3536,39.1831,
6,100.3536,39.1608,
7,100.4612,39.1617,
8,100.4612,39.1629,
9,100.4542,39.1629,
10,100.4542,39.1644,
11,100.4512,39.1644,
12,100.4512,39.1659,
13,100.4442,39.1659,
14,100.4442,39.1714,
15,100.4357,39.1714,
16,100.4357,39.1744,
17,100.4327,39.1744,
18,100.4327,39.1759,
19,100.4312,39.1759,
20,100.4312,39.1814,
21,100.4242,39.1814,
22,100.4242,39.1829,
23,100.4227,39.1829,
24,100.4227,39.1844,
25,100.4212,39.1844,
26,100.4212,39.1929,
27,100.4142,39.1929,
28,100.4142,39.1944,
29,100.4112,39.1944,
30,100.4112,39.1959,
31,100.4012,39.1959,
32,100.4012,39.2014,
33,100.3827,39.2014,
34,100.3827,39.2029,

962


15

甘肃省肃北县吐鲁东部煤炭资源详查

1,96.3744,41.4255
2,96.4132,41.4255
3,96.4132,41.3925
4,96.4200,41.3925
5,96.4200,41.3855
6,96.4047,41.3855
7,96.4047,41.3910
8,96.3846,41.3910
9,96.3846,41.3849
10,96.3820,41.3849
11,96.3820,41.4103
12,96.3744,41.4103

1,96.3748,41.4255
2,96.4136,41.4255
3,96.4136,41.3925
4,96.4204,41.3925
5,96.4204,41.3855
6,96.4051,41.3855
7,96.4051,41.3910
8,96.3850,41.3910
9,96.3850,41.3849
10,96.3824,41.3849
11,96.3824,41.4103
12,96.3748,41.4103

350


16

甘肃省兰州新区西南部地热资源普查

1,103.3649,36.3154,
2,103.3737,36.3201,
3,103.3950,36.2812,
4,103.3818,36.2629,
5,103.3727,36.2544,
6,103.3739,36.2526,
7,103.3619,36.2424,
8,103.3627,36.2416,
9,103.3732,36.2428,
10,103.3738,36.2353,
11,103.3657,36.2319,
12,103.3712,36.2311,
13,103.3636,36.2223,
14,103.3601,36.2208,
15,103.3556,36.2145,
16,103.3625,36.2047,
17,103.3513,36.2020,
18,103.3529,36.2315,
19,103.3520,36.2528,
20,103.3628,36.2511,
21,103.3701,36.2627,
22,103.3700,36.2648,
23,103.3745,36.2803,
24,103.3649,36.2828,
25,103.3627,36.2821,
26,103.3605,36.2843,
27,103.3655,36.2907,
28,103.3647,36.3103,
29,103.3649,36.3154,

1,103.3653,36.3155,
2,103.3741,36.3202,
3,103.3954,36.2813,
4,103.3822,36.2630,
5,103.3731,36.2545,
6,103.3743,36.2527,
7,103.3623,36.2425,
8,103.3631,36.2417,
9,103.3736,36.2429,
10,103.3742,36.2354,
11,103.3701,36.2320,
12,103.3716,36.2312,
13,103.3640,36.2224,
14,103.3605,36.2209,
15,103.3600,36.2146,
16,103.3629,36.2048,
17,103.3517,36.2021,
18,103.3533,36.2316,
19,103.3524,36.2529,
20,103.3632,36.2512,
21,103.3705,36.2628,
22,103.3704,36.2649,
23,103.3749,36.2804,
24,103.3653,36.2829,
25,103.3631,36.2822,
26,103.3609,36.2844,
27,103.3659,36.2908,
28,103.3651,36.3104,
29,103.3653,36.3155,

700

入库项目

17

甘肃省瓜州县明舒井金矿预查

1,94.4530,41.0600
2,94.4530,41.0700
3,94.4630,41.0700
4,94.4630,41.0800
5,94.5330,41.0800
6,94.5330,41.0500
7,94.4630,41.0500
8,94.4630,41.0600

1,94.4534,41.0601
2,94.4534,41.0701
3,94.4634,41.0701
4,94.4634,41.0801
5,94.5334,41.0801
6,94.5334,41.0501
7,94.4634,41.0501
8,94.4634,41.0601

190

入库项目

18

甘肃省敦煌市三道泉饰面用花岗岩矿详查

1,94.2336,40.5544
2,94.2508,40.5545
3,94.2508,40.5522
4,94.2622,40.5523
5,94.2609,40.5436
6,94.2252,40.5415
7,94.2228,40.5448
8,94.2338,40.5508

1,94.2340,40.5545
2,94.2512,40.5546
3,94.2512,40.5523
4,94.2626,40.5524
5,94.2613,40.5437
6,94.2256,40.5416
7,94.2232,40.5449
8,94.2342,40.5509

270


19

甘肃省敦煌市草湖饰面用花岗岩矿详查

1,94.3745,40.5557
2,94.3908,40.5558
3,94.3909,40.5438
4,94.3745,40.5438

1,94.3749,40.5558
2,94.3912,40.5559
3,94.3913,40.5439
4,94.3749,40.5439

270

入库项目

20

甘肃省肃北县白石头沟晶质石墨矿普查

1,95.4800,39.4945
2,95.4800,39.5030
3,95.4945,39.5030
4,95.4945,39.4945

1,95.4804,39.4946
2,95.4804,39.5031
3,95.4949,39.5031
4,95.4949,39.4946

160

入库项目

21

甘肃省金塔县红山崖西饰面用花岗岩矿详查

1,99.0108,40.3001
2,99.0333,40.3001
3,99.0333,40.2917
4,99.0158,40.2917
5,99.0158,40.2819
6,99.0255,40.2819
7,99.0255,40.2755
8,99.0108,40.2755

1,99.0113,40.3002
2,99.0338,40.3002
3,99.0338,40.2918
4,99.0203,40.2918
5,99.0203,40.2820
6,99.0259,40.2820
7,99.0259,40.2756
8,99.0113,40.2756

270


二、执行标准

1.技术标准:《固体矿产勘查工作规范》(GB/T33444-2016)以及勘查工作相应的现行国家标准及行业标准。

2.预算标准:《中央地质勘查基金项目预算标准》(2011年试用)。

三、报名资格

1.申请参与谈判的单位仅限于省内国有地勘单位。

2.申请参与谈判的地勘单位,必须具有安全生产许可证。

四、报名需提供的资料

1.参与竞争性谈判申请书(见附件1),事业单位法人证书复印件、安全生产许可证复印件(申请参与谈判多个项目的,需分别填写申请书)。

2.立项申请书(编写提纲见附件2),需全部密封盖章(5份全套纸质材料,另附2份文本纸质和1份电子版光盘)。

五、报名时间与地点

1.本次报名截止时间为2018年7月9日下午17:00,逾期不再受理。

2.本次报名只接受现场报名,地点:兰州市城关区定西南路18号省地勘基金管理中心401办公室。

六、谈判会议

由省国土资源厅会同省财政厅组织召开竞争性谈判会议,项目申请单位先行汇报,专家现场审阅并进行质疑,每个项目控制时间为10分钟。专家组根据工作方案和答辩情况进行评分,其中技术分为90分,预算分为10分。项目最终综合得分=去掉1个最高分和1个最低分后的技术专家算数平均分+预算专家算数平均分。2018年以前已经论证入库的项目,原申报单位参与谈判的,综合得分加10分。综合评分最高者即拟定为该项目的承担单位,会议现场宣布评分结果。

七、流标处理

本次竞争性谈判项目,当申请参与谈判的地勘单位不少于3个时,方可开展谈判工作。申请参与谈判单位少于3个时,确定为流标项目。

八、结果公示

本次竞争性谈判结果在省国土资源厅网站进行公示,公示期为5个工作日。公示期满后,最终结果以书面形式通知所有参与地勘单位。

九、其他事项

1.严格禁止各地勘单位采取暗示、授意、打招呼等方式,干预和插手具体竞争性谈判活动。一经查实,取消参与谈判资格。

2.省地勘基金管理中心将保留所有参与单位提交的各项目资料电子版。项目确定承担单位后,未中标单位提交的资料将全部返还各参与单位。

3.答辩顺序抽签及谈判会议具体时间另行通知。

联系人: 王  亮      联系电话:0931- 8783511

附件1:参与竞争性谈判申请书

附件2:立项申请书编写提纲

附件3:2018年省地勘基金竞争性谈判项目技术评议打分表

附件4:2018年省地勘基金竞争性谈判项目预算编制评议打分表

甘肃省国土资源厅

2018年7月4日

主办:甘肃省自然资源厅  技术支持:甘肃省国土资源信息中心

关于本站 | 联系我们 | 网上调查 | 网站地图

ICP备案编号:陇ICP备06003148 版权所有,未经授权,禁止转载 网站标识码:6200000011

甘公网安备 62000002000112号

当前访问量:10007876